← All demos
Bike share in New York · June 2014–2026

Twelve Junes of bike share

How the system grew from a few hundred docks in Manhattan and Brooklyn to a network across four boroughs, measured from every published trip.

2014201820222026
2014
June 2014

It started below 60th Street

937krides that June
328stations

The first network covered Manhattan south of Central Park and the edge of Brooklyn across the bridges. 7% of rides started outside Manhattan.

June 2014 → June 2026

Rides grew 5×

5.1Mrides in June 2026
2,200stations, up from 328

Each pillar is one station’s June rides. The years play from the first June to the latest; the borough labels show each one’s share of rides.

Where the growth came from

The network moved uptown and across the rivers

7%of rides outside Manhattan, 2014
38%in 2026

Stations are coloured by the June they first appear: the oldest, dark blue, in lower Manhattan; the newest, orange and yellow, in Harlem, the Bronx, Queens and deep Brooklyn.

E-bikes

Most rides are now electric

19%of June rides by e-bike, 2022
35%in 2026

Each pillar is split: classic rides in blue below, e-bike rides in orange on top. The farther from Midtown, the more electric: 70% of rides within 3 km of Times Square, 80% beyond 10 km.

One day in motion · June 2026

9,800 people riding at once

170krides that day
12 minmedian ride

Every ride of the day, replayed: each light is a rider moving from dock to dock. The peak came at 5:40 pm.

5 am9 am1 pm5 pm9 pm12 am
5:00 am
Sources and method

Where these numbers come from

    June of every other year, 2014–2026, from the operator’s public trip histories; a station is counted in a June when at least one ride started there. E-bike rides are labelled in the data from 2021. Rides over three hours are left out of the day replay. This is an independent analysis of public data.

    Made with CadYam Interactive 3D data visualization and slide deck exported from CadYam
    Learn more about CadYam →